In 45 minutes, see how TenForce brings Permit to Work and Lockout/Tagout (LOTO) together, so your teams know what’s approved, what’s isolated, and what’s safe to start. Roll out in 10–15 days with a lean implementation, best-practice setups, and expert support.
👉 Save your seat
What you’ll see
During this expert-led live walkthrough, you’ll see how to:
- Create digital permits in minutes with templates including hot work, confined space, electrical, and more.
- Link permits to isolation plans and LOTO steps, with clear status and tag/lock records.
- Control approvals and checks with roles, sign-offs, tests, attachments, and photos.
- Handle handovers and extensions safely, including conflict checks for overlapping work.
- Close the loop by verifying de-isolation with an auditable trail.
Why teams choose TenForce for Permit to Work & LOTO
- Fast go-live: Typical rollout in 10–15 days with best practices built in.
- Easy to use: Mobile-ready UI for the shop floor.
- Clear isolation control: Visualize isolation points, tag/lock status, and responsibilities.
- Conflict checks: Prevent unsafe overlaps across concurrent permits.
- Connected documents: Always use the latest controlled procedures and LOTO instructions.
- Flexible & integrated: Configure templates to site rules; connect with Incident Management, Shift Management, and Document Control.
- Audit-ready: Full traceability from request to return-to-service.
- Supported: Our experts guide you beyond go-live.
Make it obvious what’s approved, what’s isolated, and what’s safe to start.
👉 Save your seat
(Can’t make it? Get the recording.)